
SPDC Drilling Campaign in EA (Estuary of Amatu) Field Using Shengli Rig
- Client
- SPDC
- Year and location
- 2020 | EA Field (Estuary of Amatu)
- Industry and service
- Waste management · Oil & gas — upstream

Port Harcourt · Warri
+234 805 1143 391
PROJECT — OIL & GAS — DOWNSTREAM
Waste management support for Marine Platform Limited’s shore approach works including cofferdam construction and linear witch preparatory work for the Southern Swamp Sales Gas Evacuation Project. Greenbelt managed construction debris, dredged material, and industrial waste in a challenging marine environment.
Marine Platform Limited | 2017 | Southern Swamp Shore Approach
PROJECT RECORD


WHAT COMES NEXT
Tell us about the environmental, waste-management or technical requirement you are planning, and Greenbelt will confirm the appropriate scope, technology and controls.