Skip to content
SPDC Toru Node drilling campaign waste management — BR-301 rig drill cuttings treatment by Greenbelt Tropical Environs Limited, 2020.

PROJECT — OIL & GAS — UPSTREAM

Drilling Campaign in Toru Node Using BR-301 Rig

Waste management support for SPDC drilling campaign at Toru Node using the BR-301 rig. Greenbelt provided continuous drill cuttings collection, treatment, and disposal services throughout the drilling programme, ensuring zero environmental incidents and full regulatory compliance.

SPDC | 2020 | Toru Node

PROJECT RECORD
PROJECT AT A GLANCE
CLIENT
SPDC
YEAR
2020
LOCATION
Toru Node
INDUSTRY
Oil & gas — upstream
SERVICE
Waste management
TECHNOLOGY
Spill response equipment
STATUS
Completed
DEPLOYMENT & CONTROLS

What was deployed, and under what controls

TECHNOLOGY DEPLOYED

  • Spill response equipment
WHERE THIS CONNECTS

The capability behind this project

WHAT COMES NEXT

Planning a similar project?

Tell us about the environmental, waste-management or technical requirement you are planning, and Greenbelt will confirm the appropriate scope, technology and controls.